We have achieved a lot in the last few months. With the Mafiri Water Station, the basic infrastructure for the Children’s Home has been built. A 3-chamber sewage treatment plant, a service water basin and a water tower including a house and solar powered system for the water pump.

YouTube

By loading the video, you agree to YouTube's privacy policy.
Learn more

Load video

The first house of the Mafiri Children’s Home is up. More houses are to be completed in summer so that the first children and carers can move in autumn 2018.

Would you like to support our project? Get in touch with us or make the decision to donate directly.

Hanno Breitfuss: hanno.breitfuss@iplace.at

Udo Neyer: udo@crimpers.at